a large building lobby with integrated access-control lanes and CCTV.

Scope and application boundaries

01Survey
02Design
03Supply
04Installation
05Testing

The service starts from area risks, people flow, perimeter boundaries, evacuation routes, and operating requirements.

System interfaces, zoning, power, and documentation are defined after survey and coordination with the relevant disciplines.

Final scope, applicable standards, and integration responsibilities follow the approved proposal and contract.