About PT GLOBAL TEHNOLOGI INDONESIA (GTI)

PT GLOBAL TEHNOLOGI INDONESIA (GTI) is a low-voltage and ICT system integrator for industrial and commercial facilities in Indonesia, with Mandarin technical coordination.

A team meeting in a GTI-branded company room.
01 · Position

Integration starts with site conditions, not a product list.

PT GLOBAL TEHNOLOGI INDONESIA (GTI) integrates low-voltage and ICT systems for industrial and commercial facilities. Planning starts with site conditions, operating needs, risks, capacity, interfaces, and project timing.

Scope may include initial communication, survey, design, supply, coordination, installation, configuration, testing, documentation, maintenance, and upgrades within agreed boundaries. Systems include network and fiber, CCTV, access, alarms, audio visual, data centers, building automation, parking, and related infrastructure.

Mandarin-speaking staff can discuss requirements, drawings, BOQs, and technical solutions directly. Regular on-site service is available in Jakarta, Tangerang, Bekasi, Cikarang, and Karawang. Low-voltage projects can be delivered throughout Indonesia; site access, schedule, mobilization, and logistics are confirmed for each project.

02 · Scope

Systems designed to work as one environment.

GTI integrates networks, security, server rooms, and building systems through site surveys, design, installation, testing, and maintenance.

03 · Delivery method

One workflow from requirement to operation.

01Communication & survey
02Design & system boundaries
03Supply & coordination
04Installation & configuration
05Testing & documentation
06Maintenance & upgrade
04 · Field work

Coordination, implementation, and testing in real conditions.

06 · Working principles

What must remain clear in every project.

01

Start from the site

Building conditions, operations, risks, capacity, and target timing establish the design basis.

02

Define system boundaries

Interfaces, responsibilities, dependencies, and test criteria are agreed before implementation.

03

Keep evidence and records

Labels, test results, work records, and final documents must remain reviewable.

04

Design for maintenance

Design and implementation consider operation, diagnosis, change, and future maintenance.

07 · Qualifications

Qualifications for your project requirements.

Explore GTI construction SBUs, business classifications, and certificate details. Contact us to discuss the service scope and qualification documents required for your project.

View legal status & qualifications →

Start with the site condition and system requirement.

Share the facility, project stage, systems that need attention, and target timing through a GTI contact channel.

Contact →