a central plant room with pumps, control panels, and BMS service routes.

Scope and application boundaries

01Survey
02Design
03Supply
04Installation
05Testing

Start with a point list

Identify monitored equipment, values, alarms, history and any control commands. Monitoring access is not permission to control equipment. Each point needs an owner, unit, data source and operating purpose.

Interfaces and responsibility

GTI can discuss controllers, networks, servers, operator displays and system interfaces. Check protocols, registers, licenses and permissions on the actual equipment. A protocol logo or network port does not prove that every required function can be integrated.

Test with the operator

Testing can cover point mapping, units, alarms, history and communication-failure behavior. Test control logic only within approved boundaries. Agree final point lists, interface diagrams, test records and operator guidance as deliverables.

Preparing the requirement

Share the Jakarta location, systems to connect, device types, estimated points and operator needs. New integration and live-system changes carry different risks and schedules. Energy savings are not promised without a baseline and measurement method.