West Java Factory Office Network Upgrade

LAN, WiFi, switching, Cat6, rack, termination, network segmentation, and remote-access upgrades for a factory office in West Java.

Discuss a similar project · WhatsApp Business →
Technician completing termination and checks in a factory office network cabinet.
Stage
Delivered and accepted
Facility
Factory office in West Java
GTI role
Supply, installation, and commissioning
Work delivered
Office LAN, Network switching, Rack and termination, Network configuration, Handover testing
System scope

Systems coordinated as one assignment.

01Office LAN02Network switching03Rack and termination04Network configuration05Handover testing
How the work was handled

From site requirements to a handover-ready result.

A factory office in West Java needed its network upgraded while daily operations continued. Cable routes, access-point positions, cabinets, work ports, and internal-versus-external access were organized as one system.

GTI handled equipment, installation, termination, configuration, and commissioning for the office LAN, WiFi, switching, Cat6, racks, and remote access within the agreed project scope. Testing covered ports, network addressing, segmentation, access-point connectivity, and operational access.

The work was completed and handed over in January 2026. This page uses only a regional location and does not publish the factory name, detailed address, network configuration, or credentials.